News

Get all the latest Mineral Technologies events, press releases and news.

Mineral Technologies signs contract with The Egyptian Black Sands Company

Posted by on in Blog

Downer’s Mineral Technologies business has signed a contract with the Egyptian Black Sands Company to provide a comprehensive suite of equipment, engineering design and support services for the development of the first mineral sands operation in Egypt.

As only the second mineral processing operation in the country, this signing marks a historic occasion.

History

In 2006 the Nuclear Materials Authority of Egypt (NMA) engaged Mineral Technologies (MT) to develop a Comprehensive Feasibility Study for their El Burullus Black Sands project on Egypt’s Mediterranean coast. Services provided included:

  • resource modelling;
  • metallurgical testing;
  • flowsheet development;
  • preliminary plant design;
  • financial modelling;
  • environmental impact assessments; and
  • marketing studies.

Following completion of this work, the project remained undeveloped for many years until the Egyptian Government identified the project to be of national significance. The Egyptian Black Sands Company (EBSC) was subsequently formed with shareholding by the federal government (military shareholding, nuclear material authority department and the provincial government).

Project Outline

EBSC require a 2,500 t/h floating mineral sands concentrator plant and a land-based Mineral Separation Plant (MSP) to produce ilmenite, rutile, zircon and garnet products from black sands in the Burullus region.

Location

Located approximately 170km due north of Cairo, the mine site is on the Mediterranean coast next to Lake Burullus.

Mineral Technologies scope of work includes:

  • plant flow sheet;
  • detailed structural design of the floating concentrator plant and land-based MSP;
  • specification and purchase of processing equipment (both MT equipment and  third party vendors);
  • electrical controls and instrumentation;
  • power reticulation for the processing plants;
  • equipment installation oversight (onsite);
  • plant commissioning assistance (onsite); and
  • operator training (onsite).

All works, other than those identified as onsite, will be executed or arranged from MT’s office in Carrara, Queensland, Australia.

The contact duration will be approximately 24 months.

 DSC2429 1000

(L-R) Andrew Foster, EGM, Engineering & Construction, MEI, Downer; Neil Hawkins, Australia’s Ambassador to Egypt; 
EBSC  Chairman of the Board / Managing Director; and Governor of Kafr El Sheikh Governorate.

 

 DSC2500 1000

Delegation at the official signing ceremony.

 

 DSC2378 1000

(L-R) Andrew Foster, EGM, Engineering & Construction, MEI, Downer; Neil Hawkins, Australia’s Ambassador to Egypt; Administrative Assistant; EBSC Chairman of the Board / Managing Director; Governor of Kafr El Sheikh Governorate; and EBSC Commercial Manager.

More Information

Please click here for more information about Downer and Mineral Technologies.

Head Office

Carrara, Gold Coast,
Queensland

T +61 7 5569 1300

Western Australia

West Perth

T +61 8 9211 8646

South Australia

Adelaide

+61 8 8130 4900

South Africa

Alton, Richards Bay

T +55 31 3201 2606

North America

St Augustine,
Florida

T +1 904 342 8354

South America

Belo Horizonte,
Brazil

T +55 31 3201 2606

India

Kolkata, West Bengal

T +91 33 4063 7085

Kochi, Kerala

T +91 48 4278 5160

Goa, Konkan

T +91 98 2389 7911