News

Get all the latest Mineral Technologies events, press releases and news.

Improvements in Iron Ore Beneficiation for MIB in Brasil

Posted by on in Blog

MIB Brasil has recently installed our newly released Medium Intensity Magnetic Separator(MIMS) into their Iron Ore plant.

Just over 2 years ago we installed a Spiral Plant for 220 t/h feed composed of 28 HC33 Triple Start Spirals. Since then MIB has been planning to use magnetic separation to recover part of the Spiral tailings.

After a program of test works conducted at the MIB plant using the 4 poles WHIMS, we have now installed the MIMS 3000. 600mm in diameter and 3000mm long, the MIMS has a capacity of 100t/h feed and is providing an increase in mass recovery for MIB’s plant.

If you have an operation in Brasil and you are looking to increase production please contact me or write a comment below.

Head Office

Carrara, Gold Coast,
Queensland

T +61 7 5569 1300

Western Australia

West Perth

T +61 8 9211 8646

South Australia

Adelaide

+61 8 8130 4900

South Africa

Alton, Richards Bay

T +55 31 3201 2606

North America

St Augustine,
Florida

T +1 904 342 8354

South America

Belo Horizonte,
Brazil

T +55 31 3201 2606

India

Kolkata, West Bengal

T +91 33 4063 7085

Kochi, Kerala

T +91 48 4278 5160

Goa, Konkan

T +91 98 2389 7911